Commit Graph

1 Commits

Author SHA1 Message Date
Dejvino
b69eaa799d Epic 2: plan for holding five minutes
Written after watching the output rather than after building it. Records what
was measured — the cut metronome, the frozen palette, the 39% of the library
that either churns without developing or barely moves, the constant
kind-to-family table, five or six distinct images per track — and turns it
into five workstreams with gates and a sequence.

Also records what NOT to touch: the production-design layer measures as
strong as parameter variation, so the unifying mechanism is working and is
explicitly out of scope.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-06 07:23:57 +02:00